News

UWE Level 1 Nuclear Labs

14 August 2024

UWE Level 1 Nuclear Labs

RPC worked with the University of the West of England to decommission six nuclear labs to make space for 120 modular desks which we then installed. 

To decommission the rooms RPC decontaminated with all the associated equipment. The rooms were then stripped back to shells and the re-installation began. This included new ventilation, air conditioning, scene setting, lighting and AV equipment.

Working directly with UWE design team, the strip out of existing services and successful installation of new ones was carried out. It required lots of close coordination between all parties to allow for all services to come up through the floor to the local teaching desks.

You can see the change from the before and after photos.

Before:

  

Lift installation:

After: 

   

Related News

UWE HAS Lab upgrade image

UWE HAS Lab upgrade

RPC is working alongside John Perkins and the UWE team for the third year in a row to upgrade the HAS labs as part of their programme of renovation
[read more...]

Trade show visit image

Trade show visit

Dominic visited the Exeter Professional Electrician ELEX 2025.
[read more...]

Annual NIC EIC Assessment complete image

Annual NIC EIC Assessment complete

Setting high standards for ourselves.
[read more...]